The Village of Lima is seeking residents who would like to join our Climate Smart Communities (CSC) task force. The tree species will include Red Oak, Sweet Gum, White Pine, and Colorado Blue Spruce.Ĭlimate Smart Task Force Volunteers Needed After Mayor Skiptunas reads his Arbor Day Proclamation, free potted trees will be given away. The public is invited to attend the Village of Lima’s Arbor Day celebration which will be held on Saturday, May 13 thfrom 10am till noon in the Mark Tubbs Memorial Park. For more information click on the link below or contact Steve Werner at 58. There is no charge for registering and free seeds will be distributed for those who participate. Registration for Lima’s First Annual Pumpkin and Sunflower growing competition will take place on Saturday, April 29, 2023, at 1pm in the Lima Town Hall. Registration for Pumpkin Contest April 29 To read the press release, please click he link below.Ģ023 Village of Lima Local Government Achievement Award Press Release Mayor Skiptunas will be presented with the award at the NYCOM Annual Conference held on May 18th, 2023 in Saratoga Springs. The awards program, it its 33rd year, recognized Lima for its new Water System Upgrade. The New York State Conference of Mayors (NYCOM) has selected the Village of Lima as a winner of NYCOM’s Local Government Achievement Awards for 2023. Village of Lima Receives NYCOM Local Government Achievement Award Outside Village: Sewer – base 19.70, rate 8. Inside Village: Sewer – base 18.00, rate 7. Outside Village: Water – base 12.75, rate 8. Inside Village: Water – base 11.50, rate 6. Rate increases are based off the debt service for the water and wastewater treatment plant projects, as well as to cover the increased rates proposed by the City of Rochester. The Village of Lima will be holding a public hearing June 28th, 2023 at 7pm at the Lima Town Hall to discuss the proposed 2023-2024 water and sewer rates. Public Hearing Scheduled for June 28th to Discuss 2023-2024 Water and Sewer Rates Please review the notification below for further information, and contact the Village Clerk with any questions. Testing will run from June 19th to June 29th. A non-toxic smoke will be blown into the sanitary sewer system to reveal leaks where storm water and surface waters may be entering the sewer. Sanitary Sewer Leak Detection Testing Notificationīeginning June 19th, the Village of Lima will be conducting leakage testing on the sanitary sewer system located within the Village. We apologize for the inconvenience and appreciate your cooperation. You may view the designated alternate route by clicking the link below. Residents on Meadowview Drive and Rainbow Lane will need to follow the alternate route during the day of the 19th. Residents who live on Michigan Ave will need to park their cars in another area the evening of the 18th so you are able to leave your home during paving. Traffic will be open during milling, however Michigan Ave will be CLOSED to traffic from approximately 7am to 3pm during paving. Weather permitting, Michigan Avenue will be milled on July 18th and paved on July 19th. Underground Conduit Bids Due 1:45pm on 12-14-2023 See the link below for the complete addendum.Īddendum – Lima NBRC Underground RFP 12-11-2023 Other items addressed in the addendum include materials, the project term, and payment procedures. The addendum changes the due date for submitting bids to Thursday, Decemat 1:45pm. The Village of Lima has published an addendum to their RFP entitled Lima Underground RFP 11-16-2023. Underground Conduit Bid Addendum – New Due Date 1:45pm on 12-21-2023 National Grid Scheduled Outage – January 6th, 2024 Village of Lima NBRC Underground RFP Phase 1 Round 2 The complete contract specifications and project map for Phase 1 of this project may be downloaded using the links below. Phase 1 will include underground installation of a total of approximately 18,000 feet of conduit and 95 underground splice enclosures. ![]() Phase 1 entails the installation of underground conduit and splice enclosures for fiber optic cable and accessories along the following Village of Lima streets: Eastwood Circle, Eastwood Drive, Hogan Avenue, Kober Drive, Meadow View Drive, Parkside Place, and Rainbow Lane. The Village of Lima is seeking proposals from qualified contractors to complete Phase 1 of the proposed Village of Lima owned fiber optic telecommunications network. If interested, please contact the Village Clerk at (585) 624-2210. This board meets as needed, and meetings are held on the third Monday of the month at 7pm. The Village of Lima is currently looking for someone to serve as a Village representative on the Joint Town and Village Zoning Board of Appeals. News from the Village of Lima, NY Board of Trustees
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |